What installation guideline should be followed during the construction of pressure distribution systems?

Prepare for the WOSSA Septic Installer Test. Study with flashcards and multiple-choice questions to enhance your knowledge. Ace your exam with detailed explanations and hints for every question!

Using a new drill bit for orifices is essential during the construction of pressure distribution systems. This practice ensures that the orifices, which regulate the flow of wastewater into the distribution laterals, are cleanly cut and accurately sized. A sharp and new drill bit will create precise openings, minimizing the risk of damage to the conduit and preventing jagged edges that could disrupt flow or create blockages. This precision is crucial for the overall effectiveness and longevity of the septic system, as it helps maintain proper hydraulic performance.

In contrast, installing the system in a single trench would limit the distribution of effluent and potentially lead to system overload. Over-tapping the lateral lines can cause uneven flow and increased wear on system components, leading to premature failure. Limiting the number of distribution laterals could restrict the system's ability to properly distribute effluent across a larger area, which is vital for effective treatment and prevention of saturation in any one area. Hence, maintaining the integrity of the orifices through careful installation is key to achieving optimal function in pressure distribution systems.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy